Whole-Home Renovation on Crest Rd, Framingham, MA
Before and After
This family hired us for one bathroom. By the time we were done, we had rebuilt nearly every room in the house.
It started as a white ranch with a covered side porch and a main floor split into small rooms. Today that floor is one open space, and the top floor holds a primary suite.
Same house: the main floor at bare framing, then the finished kitchen.
The Kitchen
A Kitchen That Seats Eight, Showers With No Step, and a Top-Floor Suite
- Charcoal shaker base cabinets under white uppers
- Wide drawer banks with long bar pulls, so pots and dishes come out at waist height instead of from the back of a deep cabinet
- A long quartz island with stools on one side and open prep space on the other
- A dining table for eight right beside the island, so meals and homework happen in the same room as the cooking
- Gas range with a stainless hood, French-door refrigerator, and a built-in beverage fridge
- Glass-front cabinets at the end of the run for the dishes worth showing
- A wide window over the sink, so you look out at the yard while you wash up
- Globe pendants over the island and recessed lights across the ceiling
What We Built
The Main Floor
- A family room with a vaulted ceiling, a ceiling fan, and the fireplace as its focal point
- A new staircase with oak treads, white risers, and black iron balusters, built where the old layout had only a ladder opening
- A mudroom hall with patterned tile, built-in white cabinets, and coat hooks, so boots and bags stop at the door
- Hardwood floors through the kitchen, family room, and hall
- A dedicated laundry room, so washing doesn't take over the kitchen or the basement
- Bedrooms finished to match, with hardwood and recessed lighting
What We Built
The Bathrooms
- Curbless walk-in showers in large-format charcoal tile, so there's no step to trip on and the floor runs straight into the shower
- Linear drains (a long, slim drain along one edge), so the whole floor slopes one way and the tile stays in big, clean pieces
- A long recessed niche lined with glass and stone hex mosaic, with room for every bottle, so nothing sits on the shower floor
- A powder room with navy walls over white beadboard, which stands up to splashes better than painted drywall, plus a pedestal sink and patterned floor tile
What We Built
The Top Floor
- A primary bath under the roofline: freestanding soaking tub, black herringbone floor, a glass shower with a rain head, and skylights that bring daylight into the sloped ceiling
- A floating vanity with a backlit mirror and matte black fixtures
- A dressing room with a lit vanity station, floor-to-ceiling closet shelving, and a floral accent wall, so getting ready happens in its own room instead of at the bathroom sink
Why a Two-Tone Kitchen Works in a Busy House
Dark base cabinets hide scuffs from shoes, chairs, and kids, and white uppers keep the room from feeling heavy. White quartz ties the two together and bounces light from the window across the island. The long steel bar pulls match the stainless range and refrigerator, so the hardware and appliances read as one finish.
Charcoal drawers with long bar pulls
- Crest Rd, Framingham, MA
White quartz island
- Crest Rd, Framingham, MA
Glass-front cabinets
- Crest Rd, Framingham, MA
Dining beside the island
- Crest Rd, Framingham, MA
Vaulted family room
- Crest Rd, Framingham, MA
Crest Rd, Framingham, MA
Two Years, Three Phases, One Finished House
Location
- Framingham, MA
Project type
- Whole-home renovation, completed in phases
Timeline
- First bathroom in 2021, top-floor suite late 2021, main floor gutted and rebuilt in 2023
Let's Walk Your Project
Planning a Home Renovation in Framingham?
You don’t have to do it all at once. We walk the house with you, map out what makes sense now and what can wait, and you get a written, itemized price for each phase.